11:07AM November 20, 2018
HolstonConnect Admin
Unfortunately, with more than 30,000 homes and businesses and over 525 square miles of area to build, it is impossible to give estimations to individuals as to when distinct locations outside of Phase 1 will receive service. In fact, there are still multiple factors which will determine the regions to be included in Phase 2. Moreover, many facets of the construction are beyond our control, including availability of high-demand construction materials, weather, and physical terrain. These elements will dictate changes in timing, location, and other components of the process. Thus, HolstonConnect is unable to give any approximate availability dates for those outside of Phase 1 at this time, but our goal is to complete construction in 4 years. We do look forward to serving you as soon as possible.
3:52PM November 18, 2018
William Hewitt
We live on Plantation Dr is there an anticipated date for connecting us?
11:07AM November 20, 2018
HolstonConnect Admin
Unfortunately, with more than 30,000 homes and businesses and over 525 square miles of area to build, it is impossible to give estimations to individuals as to when distinct locations outside of Phase 1 will receive service. In fact, there are still multiple factors which will determine the regions to be included in Phase 2. Moreover, many facets of the construction are beyond our control, including availability of high-demand construction materials, weather, and physical terrain. These elements will dictate changes in timing, location, and other components of the process. Thus, HolstonConnect is unable to give any approximate availability dates for those outside of Phase 1 at this time, but our goal is to complete construction in 4 years. We do look forward to serving you as soon as possible.