Enter your address to start the sign-up process today.
10:13PM November 02, 2018
Lora Sandidge
Is this going to be available in the Beech Creek area in the near future? Currently, it is not in the green or tan areas.
7:18AM November 08, 2018
HolstonConnect Admin
The intention is to build Fiber to ALL of the Holston Electric Cooperative service territory within the next three years. Specific sections and roads outside Phase 1 have been grouped into 3 additional phases. At this time, there is not a definitive order determined for construction progress for those 3 additional phases. The order will likely be based upon the suggestion of outside Engineers who provide guidance during projects of this magnitude. However, we have contractors working nonstop to build the infrastructure to our members as quickly and safely as possible.
Processing..
Stand by, We are processing your payment. This window will close automatically.
Do not close your browser or press the back button.
10:13PM November 02, 2018
Lora Sandidge
Is this going to be available in the Beech Creek area in the near future? Currently, it is not in the green or tan areas.
7:18AM November 08, 2018
HolstonConnect Admin
The intention is to build Fiber to ALL of the Holston Electric Cooperative service territory within the next three years. Specific sections and roads outside Phase 1 have been grouped into 3 additional phases. At this time, there is not a definitive order determined for construction progress for those 3 additional phases. The order will likely be based upon the suggestion of outside Engineers who provide guidance during projects of this magnitude. However, we have contractors working nonstop to build the infrastructure to our members as quickly and safely as possible.